Certs Vault
See all results for ""
Home Exams
CRISC ISACA CISSP ISC2 200-301 Cisco SY0-701 CompTIA AZ-104 Microsoft AI-900 Microsoft AIGP IAPP 1Z0-1067-26 Oracle View All Exams →
Sign in Create account

UiPath Test Automation Engineer Professional v1.0 Exam UiPath-TAEPv1 Exam Questions

Preparing for the UiPath-TAEPv1 exam is simple with Certs Vault. We offer easy-to-understand study materials that help you learn the most important exam topics. You can study using our PDF questions, practice online with a real exam-style test, or use the desktop practice software. Choose the study method that works best for you and prepare at your own pace.

At Certs Vault, we keep our UiPath-TAEPv1 practice questions up to date. Whenever the exam syllabus or objectives change, we update our study materials so you always learn the latest topics. This helps you save time, avoid outdated content, and feel more confident when you take your exam.

Download Exam View Entire Exam
Page: 1 / 1
Question #1 (Topic: demo questions)

Where should be navigated in UiPath Test Manager in order to configure a new Jira connection?

A.
Navigate to the External Connections tab within Admin Settings.
B.
Navigate to the Integrations tab within Admin Settings.
C.
Navigate to the Connection tab within Project Settings.
D.
Navigate to the Integration tab within Project Settings
Correct Answer: B
Explanation:
To configure a new Jira connection in UiPath Test Manager, you need to navigate to the Integrations
tab within Admin Settings. This is where external ALM tools like Jira can be connected and managed
centrally.
Question #2 (Topic: demo questions)

Where are Postman collection endpoint activities found after being imported into a Studio library?

A.
In the Projects tab, under the namespace of the imported Postman collection.
B.
In the Activities tab, under the namespace that you have set.
C.
In the Debug tab, within the testing activities pack.
D.
In the Activities tab, under the Postman imported libraries list.
Correct Answer: B
Explanation:
After importing a Postman collection into a Studio library, the endpoint activities appear in the
Activities tab, under the namespace that you have set during the import process. This makes them
reusable across workflows.
Question #3 (Topic: demo questions)

What are the key features of UiPath Test Manager and its integration with ALM solutions, facilitated
by UiPath Test Manager Connect?

A.
UiPath Test Manager Connect offers a one-way synchronization of objects and supports a limited
number of ALM tools.
B.
UiPath Test Manager is only compatible with ALM solutions for defect management, and the
integration is facilitated by an external provider.
C.
UiPath Test Manager is compatible with leading ALM solutions, and the UiPath Test Manager
Connect, provided by Planview, ensures bidirectional synchronization for seamless data exchange.
D.
UiPath Test Manager excludes agile planning and requirement management, and the integration is
facilitated by UiPath itself.
Correct Answer: C
Explanation:
UiPath Test Manager integrates with leading ALM solutions, and the UiPath Test Manager Connect
(provided by Planview) enables bidirectional synchronization for requirements, defects, test cases,
and results—ensuring seamless and real-time data exchange between UiPath and ALM platforms.
Question #4 (Topic: demo questions)

When is it necessary to utilize the Mobile Device Manager?

A.
Both at design-time and at run-time.
B.
Never
C.
At run-time.
D.
At design-time.
Correct Answer: A
Explanation:
The Mobile Device Manager is required both at design-time and run-time when working with mobile
automation in UiPath. At design-time, it connects Studio to mobile devices for building workflows. At
run-time, it enables execution of mobile automation on those devices.
Question #5 (Topic: demo questions)

What is the purpose of UiPath Test Manager Hub?

A.
Test execution in a scheduled manner or build-driven through a CI/CD pipeline.
B.
Integration between UiPath Test Suite and third-party ALM tools.
C.
Reporting and dashboards for test results.
D.
Management of the testing process.
Correct Answer: B
Explanation:
The UiPath Test Manager Hub acts as the integration point between UiPath Test Suite
and third-party
ALM tools (like Jira, Azure DevOps). It enables synchronization of requirements, defects, test results,
and assignments, supporting seamless lifecycle management.
Download Exam
Page: 1 / 1
Next Page